ProtoProduction Updates

New version 22.23.1.926

02/04/2025

Products: Improved copying of material sets.

Machines: Pertici CTE changes for double cutting.

Offers/Orders: Change in the way motors, channels, and handles are charged for pricing from materials.

Machines: Screws at sash height with handle.

Offers/Orders: Cursor position after line copy.

Products: New lift-and-slide template.

Offers: Selection of unique motor after filtering.

Machines: Machining for faceplates.

Machines: New Elumatec DG104 machine.

Offers: Correction of panel quantity in materials.

Mechanisms: Correction of lock options after mechanism change.

Orders: Status update after sending to ERP.

Printouts:

Internal Door Offer (ARTI): Price change

Financial Offer with Discount (Alotek): Exclude add-ons without price

Financial Offer with Discount (Alotek), Financial Offer with Discount Representative (Alotek): Change of last page with company details

Change of offer details in: Shutter Offer (EBAU), Rolling Shutter Offer (EBAU), Mosquito Net Offer (EBAU), Packing List Windows-Doors (EBAU)

EcoBau: Do not include the project if it does not exist in offers

Slats – Sill Cuttings (MROLL), Box – Guide Cuttings (MROLL): New column for Slat Height

Optimize Bafeio (MROLL): Show the paint shop

Order Costs (ARALCO): Include the internal handle

Customer Offer (Kalavazidis)

Order (Kalavazidis): Include line add-ons

Remove negative add-ons from shutter price in offers: Rolling Shutter Offer (MROLL), Customer Rolling Shutter Offer (MROLL), Rolling Shutter Offer (Metallo Roll), Customer Rolling Shutter Offer (Metallo Roll)

wpChatIcon
wpChatIcon